Water preparation
| Main characteristics of the production unit: | Units | Values | ||
| WATER PREPARATION | ||||
| DECARBONATISATION | ||||
| System (reactors) | DEMI 1 | DEMI 2 | DEMI 3 | |
| Cleaning capacity | m3/h | 850 | 1,000 | 1,200 |
| Filters | sand filter, open type | sand filter, closed type | ||
| Quality of decarbonatised water | ||||
| PH | 8.5 – 8.9 | |||
| DEMINERALISATION | ||||
| Number of tracks | 3 | |||
| Cleaning capacity | m3/h | 40 | 40 | 40 |
| Deionate quality | ||||
| PH | 8.5 | |||
| Conductivity | μS/cm | 0.1 | 0.1 | 0.1 |
Coal transport
| Main characteristics of the production unit: | Units | Values | |||
| COAL TRANSPORT | Heat supply | for Unit 5 | for Unit 6 | ||
| Coal transport system | |||||
| Number of systems | 2 (1.2) | 2 (3.4) | 2 (5.6) | ||
| Conveyor belts capacity | t/h | 2×1,000 | 2×800 | 2×800 | |
| Coal silos | PE24 | system 3.4 | system 5.6 | ||
| Number of silos (bunkers) | double | 6 | 8 | ||
| Capacity | t/h | 2×1,000 | 6×300 | 8×350 | |
| Coal depot machine (coal) | PB10 | PB20 | |||
| Coal removal capacity | t/h | 550 | 1,000 | ||
| Coal depositing capacity | t/h | 800 | 1,000 | ||